News

The connection and measurement of key computing components such as AI chips, GPUs, or CPUs require WW's "connection technology".

mt news2 1

“The data center will be converted to a 1.6 Tbps network within 10 years,” said John Lee, CEO of WW’s. “No matter how excellent AI chips are, they cannot perform unless the transmission line connecting them supports them.”  2026. 6th Mar. Courtesy of Moneytoday. Thank you, everyone.

Recent Post

John Lee, CEO of WithWave, appeared on YouTube
OFC 2026 Exhibition
The connection and measurement of key computing componen...
WithWave Introduces Micro-Miniature Board to Board Conne...
WithWave Introduces New Vertical Launch 0.8 mm Connector...